Login Failed

Invalid login/password combination. You may wish to or

Error

We could not find any active order with id or e-mail mentioned. Try again

Customer Login

Order Id / E-mail
Password
Login

Password Reminder

Enter your E-mail or Order Id. After clicking submit button check you e-mail box for further instructions.
Order Id / E-mail
Submit

Go All-Digital

Supporting the global environment we supply all software as digital downloads only. How can you participate?

We all can be part of the solution. Digital downloads are the "green" answer to demanding fewer resources for your computer's needs. What you get is software with an environmental footprint of zero while still staying up-to-date.

Digital downloads are one part of the larger trend in making our lives - both professional and personal - cleaner, more efficient, and better. Continue reading to see what else you can do to improve your green computing.

Limit screen-saver use. A screen saver does not save energy. In fact, more often than not, a screen saver not only will draw power for the monitor, but also will keep the CPU from shutting down. Instead, set your computer to turn off the monitor first, then go into standby mode after a longer period of inactivity.

Disconnect your Virtual Private Network (VPN) when not actively using your corporate network. Being connected may limit your system's ability to enter standby mode.

Many popular computer games and other third party software packages that run in the background will not allow the computer to go to sleep - even if they are paused or the active window is minimized.

Some web sites or pages that have active banners and or animated advertisements will not allow the computer to sleep on its own and must be closed, or the computer put manually into a sleep state.

Enabled power management to place your monitor, hard drives and computer into a low-power "sleep" mode after a period of inactivity.

Monitor/display sleep: Turn off after 15 minutes or less

Turn off hard drives/hard disk sleep: 15 minutes or less

System standby/sleep: After 30 minutes or less

Advanced users may wish to establish multiple power schemes to address different usage models. For example, you can create a power scheme for playing music CDs that shuts off your hard drive and monitor immediately, but never puts your system into standby mode.

To further reduce power consumption, turn off computing and peripheral devices that are not being used or being used for an extended period of time such as overnight.

Plug all your electronics into one surge protector, so you can easily switch them all off when you leave the room or go to sleep. Most power supplies (such as your cell phone charger) continue to draw power and generate heat even when not attached to a device.
Cart (0)
English
Microsoft Office Project Standard 2010
System Requirements:
Windows
  • Processor 500 megahertz (MHz) processor or higher.
  • Memory 256 megabyte (MB) RAM or higher.
  • Hard Disk 1.5 GB; a portion of the disk space will be freed after installation if the original download package is removed from the hard drive.
  • Drive CD-ROM or DVD drive
  • Display 1024x768 or higher resolution monitor.
  • Operating System Windows XP with Service Pack (SP) 3 (32-bit)
    Windows Vista with SP1 (32-bit or 64-bit)
    Windows Server 2003 R2 (32-bit or 64-bit)
    Windows Server 2008 with SP2 (32-bit or 64-bit)
    Windows 7 (32-bit or 64-bit)
    Windows on Windows (WOW) (which allows installing 32-bit versions of Office 2010 on 64-bit operating systems) are supported.
  • Other You don't need to replace hardware that is capable of running Office 2007; it will support Office 2010.
  • Additional Use of graphics hardware acceleration requires DirectX 9.0c compatible graphics card with 64 MB or higher video memory. Requirements and product functionality can vary based on the system configuration and operating system.

Billing Cycle

YOU PAY$

Subscription

$ / month
RRP: $
Add to Cart

Terms of Use:

One license per seat

Supported Systems:

Windows

Included Languages:

English, čeština, dansk, Deutsch, español, français, italiano, magyar, Nederlands, norsk (bokmål), polski, português, slovenčina, suomi, Türkçe, Ελληνικά, русский, українська, עברית, العربية, 日本語, 한국어
Available: 50+
Microsoft® Project Standard 2010 gives you a new and easier way to manage projects. With significant updates and visual enhancements, this project manager software delivers project professionals with better experiences to simply be more productive and successfully complete all types of projects.

Microsoft Project Standard 2010 is a project managing software which gives Microsoft project managers a new and easier way to manage projects. With significant updates and visual enhancements, this project manager software delivers better experiences to simply be more productive and successfully complete all types of projects.

Microsoft Fluent User Interface

Work more efficiently with the simple and intuitive Microsoft Fluent user interface—new graphical menus and a familiar experience provide the tools you need to plan and manage your project.
Task-oriented tabs and contextual menu groupings reveal powerful features, making it easier to get started and realize results.
Learn about features and rich formatting controls quickly with descriptive tooltips and drop-down galleries.
Simply be more productive by choosing your own menu options, quick access toolbar settings and setting defaults.
Save to XPS or PDF. Quickly share, print, and publish project information from one location using the new Microsoft® Office Backstage™ view.

Excel-Like Flexibility & Ease

Enhanced copy and paste makes it easy to share information effectively with other Microsoft Office applications while retaining formatting.
Add columns dynamically by entering data without having to first select the data type.
Simplify data entry with auto-complete which displays a list of previously used values to select from.
Automatic text wrap eliminates extra formatting steps by adjusting row height to display full task names.
Quickly mine data and analyze results with easy access filtering for all columns.
Create emphasis with rich color options and text formatting to express ideas and solve problems in new ways.

User-Controlled Scheduling

Gain flexibility with user-controlled scheduling—manually schedule tasks with the information you have right now or choose to automatically schedule tasks with calculated dates and durations.
Be alerted to potential scheduling concerns with squiggly lines and choose how to manage potential problems.
Gain insight with the Task Inspector to recognize issues and take action early—solving problems before they occur.
Support rolling wave planning and easily create high level forecasts using manually scheduled top down summary tasks.
Identify gaps by comparing manually scheduled summary tasks with information rolled up from subtasks.
In Microsoft Project Professional 2010, you can simplify planning with inactive and activetasks to perform what-if analysis.

Timeline View

Simply create the ultimate graphical timeline to express your schedule and plan.
It's easier to see and share—drill into details and visually recognize differences with a clear view of tasks, milestones, and phases.
Reach your audience with new impact by quickly copying the timeline into an email, presentation, or any other document with formatting retained.